Start-up Performance of Hybrid Up-flow Anaerobic Sludge Blanket Reactor Treating Pulp and Paper Mill Effluent By R. Praba Rajathi, K. Ashok Kumar and T. Meenambal |
Abstract A study was performed on hybrid up-flow anaerobic sludge blanket reactor to identify the start-up time and optimum HRT required for treatment of pulp and paper mill wastewater. Initially, the reactor was loaded at an OLR of 0.117 kg COD/m3.hr and HRT of 24h. Loading rates were increased by reducing HRT 24, 20, 16, 14, 12, 10, 8, 6h, which corresponds to the OLR of 0.117, 0.141, 0.175, 0.201, 0.233, 0.294, 0.348, 0.458 kg COD/m3.h. An optimum HRT of 8 h, HUASB reactor shows COD and TSS removal efficiency of 80% and 85% respectively. When HRT was reduced beyond 8h, lower COD removal efficiency of 71% and TSS removal efficiency of 70% were observed. Finally, the reactor took 120 days for complete start-up. The granule formation was observed inside the reactor by drawing the sample along the port, which shows sizes of 1-2 mm. |
| Reference: Volume 9, Issue No. 1, Mar 2010 , Page No 495-501 |
 |
|
| |
|
|
|
| Vol 12, No 1, Mar 2013 |
| Vol 11, No 4, Dec 2012 |
| Vol 11, No 3, Sep 2012 |
| Vol 11, No 2, Jun 2012 |
| Vol 11, No 1, Mar 2012 |
| Vol 10, No 4, Dec 2011 |
| Vol 10, No 3, Sep 2011 |
| Vol 10, No 2, Jun 2011 |
| Vol 10, No 1, Mar 2011 |
| Vol 9, No 4, Dec 2010 |
| Vol 9, No 3, Sep 2010 |
| Vol 9, No 2, Jun 2010 |
| Vol 9, No 1, Mar 2010 |
| Vol 8, No 4, Dec 2009 |
| Vol 8, No 3, Sep 2009 |
| Vol 8, No 2, Jun 2009 |
| Vol 8, No 1, Mar 2009 |
| Vol 7, No 4, Dec 2008 |
| Vol 7, No 3, Sep 2008 |
| Vol 7, No 2, Jun 2008 |
| Vol 7, No 1, Mar 2008 |
| Vol 6, No 4, Dec 2007 |
| Vol 6, No 3, Sep 2007 |
| Vol 6, No 2, Jun 2007 |
| Vol 6, No 1, Mar 2007 |
|
| |
|
|